The Devil Wears Prada 2 - Title Announcement
The Devil Wears Prada 2
Lilo & Stitch - Car Ride Scene
Lilo & Stitch
Lilo & Stitch - Frog's POV Clip
Lilo & Stitch
My Life with the Walter Boys Season 2 - Noah LaLonde as Cole
My Life with the Walter Boys
Thunderbolts* - Official Behind the Scenes Clip
Thunderbolts*
The Fantastic Four: First Steps - Höt Aftershave Promo Poster
The Fantastic Four: First Steps
Murderbot - Now Streaming Clip
Murderbot
Chief of War Season 1 - Official Poster
Chief of War
The Roses - Vows Clip
The Roses
Murderbot Season 1 - Alexander Skarsgård with a Weapon
Murderbot
Black Bag - Cate Blanchett Exclusive Interview
Black Bag
She Rides Shotgun - Official Teaser Poster
She Rides Shotgun
Lilo and Stitch - Spaceship Escape Clip
Lilo & Stitch
The Long Walk - Garrett Wareing Character Poster
The Long Walk
Ironheart - Official Trailer
Ironheart
The Smashing Machine - Dwayne Johnson at UFC Hall of Fame
The Smashing Machine
Home Again with Bob Vila

Home Again with Bob Vila Season 10: Episode Guide & Ratings

Season 10 Episodes

1. Habitat for Humanity: Habitat for Humanity Project Begins

September 6th, 1999

Plans are under way to build a house in one week with a team of Habitat for Humanity volunteers in Yonkers, NY. Included: a tour of Yonkers and of a Habitat community in Phoenix.

2. Habitat for Humanity: Framing the Walls

September 13th, 1999

The walls go up at the Roxbury project, and Bob Vila tours a manufacturing facility where special structural insulated panels (SIPs) are made. Also: a look at a money-saving system for recapturing heat from drain water.

3. Habitat for Humanity: Working On the Roof

September 20th, 1999

Roof framing begins and the giant ridge beam is raised. Also: a tour of the Oregon plant where I-joists are made.

4. Habitat for Humanity: Exterior Trim and Porch Ceiling

September 27th, 1999

Exterior trim work continues, while overlaid plywood is installed on the porch ceiling by a team of volunteers and celebrities. Included: tour of a plywood mill in Washington.

5. Habitat for Humanity: Sheathing and Shingling the Roof

October 4th, 1999

Roofing work continues with the installation of photovoltaic shingles that convert solar energy into electricity. Also: a tour of the Global Solar Plant in Arizona.

6. Habitat for Humanity: Siding and Drywall

October 11th, 1999

A special siding goes up, and drywall with pre-finished corners is installed in record time.

7. Habitat for Humanity: Building the Back Porch

October 18th, 1999

The back porch is built with help from some high school tech students, and the trim gets finishing touches.

8. Habitat for Humanity: Painting and Door Installation

October 25th, 1999

Bob Vila explains door installation, while indoor and outdoor painting gets underway at the project house.

9. Habitat for Humanity: Floor Installation

November 1st, 1999

An entertainment center, flooring, and loft shelves are installed.

10. Habitat for Humanity: Working On the Kitchen

November 8th, 1999

Cabinets and counter tops are installed in the kitchen, and money saving energy efficient appliances are discussed.

11. Habitat for Humanity: Carpet and Bathroom Fixtures

November 15th, 1999

Carpet is laid in a bedroom and high efficiency fixtures are installed in the bathroom.

12. Habitat for Humanity: Interior Design

November 22nd, 1999

Guest B. Smith applies a colorful wainscot pattern along the wall of the children's bedroom.

13. Habitat for Humanity: House Tour

July 13th, 2025

14. Executive Mansion: Governor's Mansion Tour

December 6th, 1999

Bob Vila and crew take on restoring the Virginia governor's Federal style mansion, built in 1813.

15. Executive Mansion: Restoring the Floor

December 13th, 1999

Floor restoration is underway with an acrylic injection technique.

16. Executive Mansion: Preparing to Pour a Concrete Floor

December 20th, 1999

Preparations are made to pour a concrete floor in the basement, utilizing an elaborate concrete pump system.

17. Executive Mansion: Removing Windows for Restoration

December 27th, 1999

Paint is removed from the masonry garden walls and windows are taken down for restoration.

18. Executive Mansion: Framing New Walls

January 3rd, 2000

Framing and trim work are underway in the basement, which is being transformed to include a state-of-the-art kitchen, wine cellar, and laundry.

19. Executive Mansion: Installing a Dumbwaiter

January 10th, 2000

A dumbwaiter is installed to connect the basement kitchen with the first-floor dining room.

20. Executive Mansion: Installing Baseboards

January 17th, 2000

Baseboard is installed on the second floor to accommodate updated HVAC and electrical systems.

21. Executive Mansion: Basement Kitchen

January 24th, 2000

Preparations are made in the basement kitchen for state-of-the-art foodservice equipment and appliances.

22. Executive Mansion: Mantelpiece Restoration

January 31st, 2000

The mantelpieces are preserved in order to restore historic features to the mansion.

23. Executive Mansion: Technology Systems Tested

February 7th, 2000

Landscaping, masonry work, and painting are done on the mansion's exterior.

24. Executive Mansion: Finishing the Kitchen

February 14th, 2000

A small kitchen in the governor's private quarters is finished and carpet is put down in the bedrooms.

25. Executive Mansion: Interior Decorating

February 21st, 2000

The mansion gets elaborate interior decor.

26. Executive Mansion: Mansion Final Tour

July 13th, 2025

All Seasons

Season 15

Season 15

Sep 13, 2004
Season 14

Season 14

Sep 8, 2003
Season 11

Season 11

Sep 4, 2000
Season 10

Season 10

Sep 6, 1999
Season 9

Season 9

Sep 7, 1998
Season 8

Season 8

Sep 1, 1997
Season 7

Season 7

Sep 2, 1996
Season 6

Season 6

Sep 4, 1995
Season 5

Season 5

Sep 5, 1994
Season 3

Season 3

Sep 7, 1992
Season 2

Season 2

Sep 2, 1991
Season 1

Season 1

Sep 3, 1990