Mega Shippers poster

Mega Shippers Season 3

Returning Series 2016–2020
90
Audience
90
Audience

Where to Watch

Region
Prices last updated October 5, 2026. Pricing and availability may vary by region.
powered by JustWatch

Season 3 Episodes

10 episodes
1
Carriage 58 - 10 Racing Yachts - Sheet Pile Steel
Aug 11, 2020
Kieran struggles to get a 26-tonne train rolling for the first time in 60 years. Colin has 48 hours to load ten valuable racing yachts. Robin Has 5 hours to unload 1500 Tons of Sheet Pile construction steel.
2
Jack Up Rig (Part 1) - Darwin - Mining Machine
Aug 18, 2020
A heavy lift vessel takes onboard a 23,000-tonne oil rig. Plus, a blanket of fog keeps one of the world's biggest airplanes grounded.
3
Satellite - Liverpool Flyover - Wood Ship
Aug 25, 2020
Massive machines are brought in to move a raised dual carriage way. Plus, a team race against time to underload a shipment of timber.
4
Gantry Cranes (Part 1) - China - Herb Isles - Sand Ship
Sep 1, 2020
It's a race against time as six massive container cranes have to be loaded in three days. And, a ferry is in urgent need of repair.
5
Rotor - Super Cars - Fertiliser Ship
Sep 8, 2020
Craig has 48 hours to get four super cars to Spain. Meanwhile, rain threatens to ruin an incoming shipment of fertiliser worth up to £45,000,000.
6
Monopiles (Part 1) King Edward Train
Sep 15, 2020
One of the biggest heavy lift vessels in the world is squeezed through a narrow canal in Germany. Plus, a 90-tonne locomotive is loaded onto a truck.
7
Jack Up Rig (Part 2) - Melbourne - Boat Doors - Christmas Trees
Sep 22, 2020
A 23,000-tonne oil rig needs offloading in Melbourne. Plus, a driver battles bad weather to deliver Christmas trees.
8
Gantry Cranes (Part 2) - Miami - Cables - Pastor Pete
Sep 29, 2020
In Miami, there are just two days to unload six container cranes. Meanwhile, Martin has to check and store 1,200 metres of mooring ropes.
9
New Haven Bridge - Sawn Timber - Flying Fish
Oct 6, 2020
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
10
Monopiles (Part 2) - Spanish Trains - Refuse Bails
Oct 13, 2020
The loading of wind turbine sections threatens to capsize a ship. Plus, 3,000 bales of compacted rubbish are shipped to Sweden.